Institute of Translational Medicine Institute of Translational Medicine, Birmingham:

  • Intro: Refurbishment and remodelling to create new office accomodation in Birmingham (circa 5,500 m2)
  • Client: RPS
  • Duties: Detailed comfort and ADL2A modelling and advice


Southmead Pathology Southmead Pathology, Bristol:

  • Intro: New-build office accomodation in Bristol (circa 5,250 m2)
  • Client: Ramboll
  • Duties: Detailed comfort and ADL2A modelling and advice


City West Eccles City West Eccles:

  • Intro: New-build office accomodation in Manchester (circa 2,500 m2)
  • Client: Briggs and Forrester
  • Duties: 'As built' BRUKL and EPC services

Lancashire County Cricket Club Pavilion Lancashire County Cricket Club Pavilion:

  • Intro: Refurbishment and extension of the existing Pavilion building including new office accomodation (circa 3,800 m2)
  • Client: GenLec
  • Duties: 'As designed' modelling services including BRUKL and Energy Performance Certificate services and thermal comfort assessments

Co-operative Head Quarters ManchesterCo-operative Head Quarters Manchester:

  • Intro: A large newly designed Office facility (circa 45,000 m2)
  • Client: De Montfort University
  • Duties: 'As built' Energy Performance Certificate services. Building achieved A+ rating

62-64 Cornhill 62-64 Cornhill:

  • Intro: London office refurbishment project (1,600 m2)
  • Client: Skandia Property Fund
  • Duties: 'As Designed' Energy Performance Certificate Services to support project development and BREEAM assessment.


Manchester Rail Operating Centre Manchester Rail Operating Centre:

  • Intro: A new-build office facility for Network Rail (6,200 m2)
  • Client: GenLen Ltd
  • Duties: 'As Design' Part L2A and Energy Performance Certificate Services to support project development.


Rugby Rail Operating Centre Rugby Rail Operating Centre:

  • Intro: A new-build office facility for Network Rail (6,500 m2)
  • Client: GenLen Ltd
  • Duties: 'As Designed' Part L2A and Energy Performance Certificate Services to support Bid.


Chester University Kingsway Chester University Kingsway Office:

  • Intro: A new-build office facility (1,500 m2)
  • Client: QDS Ltd
  • Duties: 'As Built' Energy Performance Certificate Services.


Soapworks Manchester Soapworks Manchester:

  • Intro: A large open planned air conditioned office facility (19,000 m2)
  • Client: Environmental Services Design Ltd
  • Duties: Part L2A carbon emission calculations, energy performance analysis, steady state and dynamic load calculations.

Co-op HQ, ManchesterCo-op HQ, Manchester:

  • Intro: A large newly designed Office facility (circa 45,000 m2)
  • Client: De Montfort University
  • Duties: Energy Performance analysis and thermal modelling advice to a large head quarters office. The design includes plant oil CHP units, adiabatic cooling, underground air intake labyrinths, active facade and detailed solar shading. The building has been designed to achieve an EPC A rating. Forty4 provided accredited EPC analysis and advised De Montfort University regarding load analysis and predictive energy studies.

BAe609.JPG BAe Office 609:

  • Intro: A large newly constructed Office facility (9,400 m2)
  • Client: Gifford
  • Duties: Energy Performance Certification duties including dynamic simulation modelling


forty4consulting staff have further experience in the office sector, working as consultants on the following projects:

Offices

City of York Council Offices
A £24M new build office development. High sustainability agenda. 30% improvement on Part L, 20% renewable energy generation.

Liverpool International Business Park
Office development, £3M. Building Sciences input.

Chester Leadworks Shot tower
Building Sciences input.

Administration Block, RAF Sealand, Wales
Refurbishment of an existing warehouse to a high standard air-conditioned office.

Sion Mills, Ireland
Strategic site wide energy strategy, including renewable generation, for a large mixed use development of 27,000m2.

Building 14, RAF Sealand, Wales
Refurbishment of an existing warehouse to comprise a mix of office areas, electronic workshops, canteen and WC/shower facilities.

Canary Wharf Tower, One Canada Square, Canary Wharf
The Bank of New York. A fit out project of four floors, approximately 8,000 m2.

WF9, Canary Wharf. Canary Wharf Management
A new build project for a speculative office development of approximately 18,000 m2.

Millbank Tower – The Labour Party Headquarters
Tishman Speyer Properties Ltd. Refurbishment of CHW services for an existing office block built in the 1960’s. Approximately 100,000 m2 with 2.2MW of cooling.

Gleeds UK & Ireland
Concept design proposal of a £12M head office building. Assisting the design team in its ambition to design and build the first BREEAM outstanding office building in the UK

Cirrus Building, Nottingham
Office accommodation circa 3500 m2

Wrexham County Borough, Lambpit Street offices
Design of retrofit air conditioning to an existing administration cellular office facility.

Solicitors Head Office (Company Withheld)
Performance specification (M&E) for new build 200 occupant open plan office facility to BREEAM Excellent and 10% onsite renewables.

Miller Birch, Nottingham
Three phases of pavilion offices built totalling 85,000sqft of which other occupiers include Bank of England, Black Horse, Chaucer Insurance plc and Staffline Recruitment